日本黄色视频在线免费网站|xxxx日本真实自拍一卡|亚州AV无码永久无限精品|琪琪精品视频在线播放免费

EPC Products Civil Engineering Testing Instruments Geotechnical Testing Quality Assurance Steel and Rebars Testing CorroRisk - Retro-Fit Corrosion Front Probes
產品中心
CorroRisk - Retro-Fit Corrosion Front Probes

Model:CorroRisk

Use:The CorroRisk probe has been developed for corrosion monitoring on existing concrete structures.

Standard:

CorroRisk - Retro-Fit Corrosion Front Probes

The CorroRisk probe has been developed for corrosion monitoring on existing concrete structures. The chloride probe ensures that reinforcement corrosion can be predicted in good time before the actual initiation. The planning of the necessary maintenance can be optimised and the result is a lower cost of repair and fewer traffic obstructions.

The CorroRisk probe is recommended to be used in all types of existing concrete structures, especially in aggressive corrosive environments and where visual inspection is difficult. This could e.g. be pillars in seawater (Figure 1), bridge decks, multi-storey car parks exposed to de-icing salt and various structures in swimming pools.

CorroWatch is recommended for new structures. It is installed before casting the concrete.

Image: CorroRisk probes mounted on bridge pillar.

 

STRUCTURE

The CorroRisk probe consists in the standard version of 4-8 measuring electrodes and 1 combi-electrode. The electrodes are made of the same material as the reinforcement. The combi-electrode consists of a titanium net and a reference electrode (ERE20), which has been developed earlier for use in concrete structures.

Image: CorroRisk mounted on bridge pillar and covered with latticework.

MEASURING METHOD

Initial corrosion is discovered when threshold values of the potentials or current have been exceeded. The potential of the equilibrium is measured between the combi-electrode and the individual electrodes in the concrete cover.

INSTALLATION

The CorroRisk is usually mounted in the cover layer between the concrete surface and the outer reinforcement layer. The electrodes are mounted in different but well-defined depths in the cover layer. All electrodes are mounted in a circle around the combi-electrode. The electrodes are supplied with a coaxial cable, which on the concrete surface is protected by a latticework. The cables are lead to a monitoring box, and e.g. a data logger (Figure 2 and 3).

Image: Sectional view of the mounted CorroRisk probe.

CorroZoa

The CorroZoa is a data logging Zero Ohm Ammeter designed for compatibility with Force’s CorroWatch and CorroRisk chloride monitoring probe systems.

The CorroZoa will measure half-cell potential, corrosion current, and temperature. The unit can either be used manually or automated and left as a data logger.

 



Project Case
Solution
Download
相關標簽
主站蜘蛛池模板: 铁岭县| 道真| 景洪市| 江陵县| 兴海县| 永寿县| 锡林浩特市| 南安市| 盐边县| 巴马| 陕西省| 深泽县| 水城县| 霍城县| 平湖市| 丹阳市| 那曲县| 连州市| 阿瓦提县| 石狮市| 镇康县| 庆安县| 拜泉县| 东乌珠穆沁旗| 庐江县| 浦城县| 甘谷县| 高邑县| 渭南市| 禹州市| 五大连池市| 西充县| 筠连县| 思南县| 新田县| 基隆市| 盘锦市| 牙克石市| 长宁县| 巴彦淖尔市| 文成县|