日本黄色视频在线免费网站|xxxx日本真实自拍一卡|亚州AV无码永久无限精品|琪琪精品视频在线播放免费

EPC Products Civil Engineering Testing Instruments Structural and Materials Testing Highway and Bridge Inspection Asphalt Mixture Asphalt Mixture Performance Tester AMPT Pro
產(chǎn)品中心

Description

IPC Global, the researcher’s choice for advanced asphalt testing equipment has again set the benchmark for innovation and performance with the new AMPT PRO. Designed with the latest technologies and product developments, the AMPT PRO surpasses any other product on the market.
Fully complies with AASTHO TP9 and can perform the three asphalt tests of NCHRP Projects 9 -19 and 9-29 - Dynamic modulus, Flow number and Flow time with ease. In addition it can perform Uniaxial Fatigue / SVECD, Overlay test, Semi-Circular Bend, Indirect Tensile Dynamic Modulus, iRLPD and Small Diameter Dynamic Modulus and SVECD tests with the additional of optional hardware accessories.

The Asphalt Mixture Performance Tester can be used as part of your Superpave performance based testing program.

This original Asphalt Mixture Performance Tester (AMPT) is the culmination of two National Cooperative Highway Research Program (NCHRP) projects. IPC Global has been involved in IPC Global equipment, and has been successfully evaluated by NCHRP.


Standard outfit
AMPT Pro includes, as standard, the following testing Modules (compression platens) which, however, have been completed with the transducer kit accessory.

Dynamic Modulus E to AASHTO TP79 and NCHRP 9-29
A performance.related property, for asphalt mixture evaluation and charachterising the stiffness of HMA. It is an important input parameter for AASHTO "Mechanistic-Empirical Pavement Design Guide".

  • Creates master curves for structural design
  • Assess modified binders and local materials
  • Forensisc analysis of pavement failure

Flow number to AASHTO TPXX and NCHRC 9-29
Flow number is related to the resistance of HMA to permanent deformation.

  • Repeated load creep tests
  • Evatluate rutting
  • Accurate simulation of actual loading

Flow time to NCHRP 9-29
Flow time is a quick and simple measurement of the resistance of HMA to permanent deformation.

  • Static creep tests
  • Measure permanent deformation for rutting evaluation
Project Case
Solution
Download
相關(guān)標(biāo)簽
Asphalt Testing, controls
主站蜘蛛池模板: 眉山市| 桐庐县| 红安县| 福泉市| 湖州市| 焉耆| 乐东| 灵武市| 塔城市| 台东市| 呼玛县| 长春市| 平凉市| 阿勒泰市| 丰县| 专栏| 冀州市| 霍邱县| 紫金县| 韶关市| 桐柏县| 资溪县| 辉南县| 登封市| 扶余县| 大方县| 新闻| 峨边| 建湖县| 沙湾县| 霍林郭勒市| 长宁区| 涪陵区| 漯河市| 奉节县| 扬州市| 海阳市| 孙吴县| 九寨沟县| 太白县| 兴安县|